Castro Street portion of project is complete; punch list details being addressed.
Cratus, Inc. the contractor has completed the installation, testing and connection of sewer and water pipelines along Castro Street from 19th Street to 26th Street. The roadway has been restored as well, including concrete and asphalt portions.
26th Street portion of work is complete; punch list details being addressed.
Cratus, Inc. the contractor has completed the installation, testing and connection of sewer and water pipelines along 26th Street from Guerrero Street to Castro Street.
Harry Aleo Parking Lot, 4061 24th Street, reopened; punch list details being addressed.
Final asphalt paving has been done to the parking lot located between Castro and Noe streets. Final striping of the parking stalls is done. All signage has been installed. A 6-inch-curb topped by a 30-inch handrail has been built and painted just behind the commemorative bench facing 24th Street to meet Americans With Disabilities Act requirements.