Active Alerts

There are no alerts at this time.

Kansas and Marin Streets Sewer Improvements

Overview

As part of these citywide investments, the proposed Kansas and Marin Streets Sewer Improvements Project is intended to increase the hydraulic capacity of the sewer system to reduce the risk of localized flooding during heavy rains. This Project proposes to construct:

  • An 8-foot diameter, approximately 900-feet long sewer tunnel
  • Two connecting underground concrete sewer structures
  • Restoration of existing surface features
  • Construction Start: Summer 2020
  • Contruction End: Summer 2022
  • Project Phase: Construction